Entity Briefing
Generated May 6, 2026·Data as of May 6
3
Generators
21 MW
Capacity
4.3%
Capacity Factor
8 GWh
Annual Generation

Tunnel, a 21 MW hydroelectric plant operating since 1919, is undergoing a significant upgrade with the Fishheart Fish Passage System, despite recent generation being near zero.

Overview

  • Plant Name: Tunnel
  • Location: Connecticut
  • Status: Operating since 1919
  • Operator: FirstLight Power Resources Services LLC (EIA operator)
  • Owner: FirstLight Hydro Generating Company
  • Project Name: Fishheart Fish Passage System at Tunnel Hydropower Plant (International Water Power, 2025-05-13)
  • Developer: FirstLight Power (International Water Power, 2025-05-13)
  • EPC Contractor: Fishheart Ltd. (International Water Power, 2025-05-13)
  • Latest Milestone: Project start in 2024 (International Water Power, 2025-05-13)
  • Expected COD: Q4 2024 (Energy-Storage.News, 2022-10-13)

Fleet Details

  • Capacity: 21 MW
  • Technology: Conventional Hydroelectric, Petroleum Liquids
  • Generators: 3 units
  • Grid Connections: ISO New England (ISO), NPCC (NERC), ISO New England Inc. (BA)

Generation & Performance

  • Annual Generation: 8 GWh
  • Capacity Factor: 4.3%
  • Recent Generation (2024-10 to 2024-12): 0 GWh each month
  • Generation Trend: Down 94% over the past 6 months compared to the prior 6 months

Financial Profile

  • Capital Expenditure: $2294/kW (Source: eia_agg_cost)

Tunnel is an aging hydroelectric plant undergoing significant updates, including a new fish passage system and an expected commercial operation date in Q4 2024. Despite its long operational history, recent generation has been minimal, indicating a period of low output or potential refurbishment activities.