# Interconnection Queue Projects in PJM Interconnection 1,982 queue projects · 242,209 MW proposed · across 13 states Top technologies: Solar (1,137 projects, 94,783 MW); Battery (408 projects, 48,884 MW); Solar+Battery (210 projects, 22,716 MW); Wind (113 projects, 12,919 MW); Gas (74 projects, 35,242 MW). ## Top 200 projects by capacity (of 1,982 total) Format: name | capacity | technology | state | developer | url - Salem 500kV | 2651 MW | Nuclear | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-710-moved-to-tc2-salem-500kv - Braidwood 345 kV | 2584 MW | Nuclear | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-698-moved-to-tc2-braidwood-345-kv - Byron 345 kV | 2530 MW | Nuclear | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-702-moved-to-tc2-byron-345-kv - PJM-AI2-431 | 2139 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai2-431 - PJM-AI1-001 | 2100 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai1-001 - PJM-AG2-582 | 2100 MW | Gas | WV | — | https://www.powerplantsinfo.org/project/pjm-ag2-582 - Flint Run 500 kV | 2100 MW | Gas | WV | — | https://www.powerplantsinfo.org/project/pjm-ag2-582-moved-to-tc2-flint-run-500-kv - Rogers Road 500 kV | 1756 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-677-moved-to-tc2-rogers-road-500-kv - PJM-AI2-129 | 1676 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai2-129 - Heritage 500 kV | 1526 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-678-moved-to-tc2-heritage-500-kv - Hanging Rock 765 kV | 1364 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-686-moved-to-tc2-hanging-rock-765-kv - Lasalle 345 kV | 1360 MW | Nuclear | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-714-moved-to-tc2-lasalle-345-kv - PJM-AJ1-015 | 1342 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-aj1-015 - PJM-AI1-110 | 1310 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai1-110 - PJM-AI1-111 | 1310 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai1-111 - PJM-AI1-109 | 1310 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai1-109 - Sammis - South Canton 345 kV | 1300 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-680-moved-to-tc2-sammis-south-canton-345-kv - Maidsville CCGT | 1270 MW | Gas | WV | — | https://www.powerplantsinfo.org/project/pjm-ae1-105-maidsville-ccgt - Wellsville 345 kV | 1210 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-699-moved-to-tc2-wellsville-345-kv - Aurora E.C. 138kV | 1206 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-563-moved-to-tc2-aurora-e-c-138kv - Nelson-Electric Junction 345 kV | 1200 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-151-moved-to-tc2-nelson-electric-junction-345-kv - PJM-AI2-457 | 1122 MW | Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ai2-457 - Lemoyne 345 kV | 1108 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-711-moved-to-tc2-lemoyne-345-kv - South Bend 500 kV | 1058 MW | Gas | PA | — | https://www.powerplantsinfo.org/project/pjm-ah1-734-moved-to-tc2-south-bend-500-kv - Nelson-Electric Junction 345 kV | 1000 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-150-moved-to-tc2-nelson-electric-junction-345-kv - PJM-AH2-351 | 1000 MW | Solar | KY | — | https://www.powerplantsinfo.org/project/pjm-ah2-351 - PJM-AH2-353 | 1000 MW | Solar | KY | — | https://www.powerplantsinfo.org/project/pjm-ah2-353 - Cunningham 500 kV | 1000 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-681-moved-to-tc2-cunningham-500-kv - PJM-AG2-466 | 1000 MW | Solar+Battery | WV | — | https://www.powerplantsinfo.org/project/pjm-ag2-466 - Lordstown 345 kV | 970 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-706-moved-to-tc2-lordstown-345-kv - Trumbull Energy Center | 940 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ab1-105-trumbull-energy-center - PJM-AG2-348 | 898 MW | Offshore Wind | DE | — | https://www.powerplantsinfo.org/project/pjm-ag2-348 - Three Mile Island 230 kV | 859 MW | Nuclear | PA | — | https://www.powerplantsinfo.org/project/pjm-ah1-695-moved-to-tc2-three-mile-island-230-kv - Cheltenham 500 kV | 854 MW | Gas | MD | — | https://www.powerplantsinfo.org/project/pjm-ah1-744-moved-to-tc2-cheltenham-500-kv - PJM-AD1-100 | 850 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ad1-100 - PJM-AF1-124 | 836 MW | Offshore Wind | VA | — | https://www.powerplantsinfo.org/project/pjm-af1-124 - PJM-AF1-123 | 833 MW | Offshore Wind | VA | — | https://www.powerplantsinfo.org/project/pjm-af1-123 - PJM-AF1-125 | 820 MW | Offshore Wind | VA | — | https://www.powerplantsinfo.org/project/pjm-af1-125 - Ocean Wind | 816 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ae1-020-ocean-wind - Linden 230kV | 806 MW | Gas | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-722-moved-to-tc2-linden-230kv - Linden 230kV | 803 MW | Gas | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-715-moved-to-tc2-linden-230kv - Nelson - Electric Junction 345 kV | 800 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-044-moved-to-tc2-nelson-electric-junction-345-kv - PJM-AE1-173 | 800 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ae1-173 - PJM-AJ1-008 | 800 MW | Solar+Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-aj1-008 - Laurel-Cooper 161 kV | 786 MW | Gas | KY | — | https://www.powerplantsinfo.org/project/pjm-ah1-721-moved-to-tc2-laurel-cooper-161-kv - Cunningham 500 kV | 776 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-723-moved-to-tc2-cunningham-500-kv - Cunningham 500 kV | 776 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-712-moved-to-tc2-cunningham-500-kv - Elderberry 345 kV | 767 MW | Gas | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-562-moved-to-tc2-elderberry-345-kv - Four Rivers 230 kV | 766 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-679-moved-to-tc2-four-rivers-230-kv - PJM-AH2-348 | 700 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-348 - PJM-AG2-072 | 700 MW | Gas | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-072 - Dequine-Eugene 345 kV | 700 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-163-moved-to-tc2-dequine-eugene-345-kv - Rockport 765 kV | 700 MW | Gas | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-072-moved-to-tc2-rockport-765-kv - Clover-Rawlings 500 kV | 700 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-077-moved-to-tc2-clover-rawlings-500-kv - Beverly 345 kV | 694 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-719-moved-to-tc2-beverly-345-kv - Bear Garden 230kV | 682 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-687-moved-to-tc2-bear-garden-230kv - Bergen 230kV | 671 MW | Gas | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-703-moved-to-tc2-bergen-230kv - PJM-AH1-552 | 670 MW | Solar+Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ah1-552 - Chalk Point 230 kV | 670 MW | Solar+Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ah1-552-moved-to-tc2-chalk-point-230-kv - Possum Point 230kV | 668 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-696-moved-to-tc2-possum-point-230kv - Surry-Skiffes Creek 500kV | 650 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-716-moved-to-tc2-surry-skiffes-creek-500kv - PJM-AH1-466 | 600 MW | Solar | KY | — | https://www.powerplantsinfo.org/project/pjm-ah1-466 - Nelson-Electric Junction 345 kV | 600 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-660-moved-to-tc2-nelson-electric-junction-345-kv - Sullivan Generating Station 2 | 575 MW | Gas | IN | — | https://www.powerplantsinfo.org/project/pjm-ab1-088-sullivan-generating-station-2 - Sullivan Generating Station 1 | 575 MW | Gas | IN | — | https://www.powerplantsinfo.org/project/pjm-ab1-087-sullivan-generating-station-1 - Chesterfield CT Units 3&4 | 569 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-af1-129-chesterfield-ct-units-3-4 - PJM-AF1-128 | 569 MW | Gas | VA | — | https://www.powerplantsinfo.org/project/pjm-af1-128 - Glen Falls Facility | 550 MW | Gas | WV | — | https://www.powerplantsinfo.org/project/pjm-aa2-119-glen-falls-facility - Mt. Storm 500kV | 538 MW | Coal | WV | — | https://www.powerplantsinfo.org/project/pjm-ah1-713-moved-to-tc2-mt-storm-500kv - Hannibal 138 kV | 509 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-704-moved-to-tc2-hannibal-138-kv - PJM-AF2-042 | 500 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-af2-042 - Conastone 500 kV | 500 MW | Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ah1-725-moved-to-tc2-conastone-500-kv - PJM-AG2-655 | 500 MW | Solar | WV | — | https://www.powerplantsinfo.org/project/pjm-ag2-655 - PJM-AG2-375 | 500 MW | Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-375 - Fourth Quarter | 500 MW | Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ag1-483-fourth-quarter - Heritage - Wake 500 kV | 500 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-571-moved-to-tc2-heritage-wake-500-kv - Rogers Road - Carson 500 kV | 479 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-339-moved-to-tc2-rogers-road-carson-500-kv - PJM-AG1-226 | 450 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag1-226 - PJM-AI1-022 | 450 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ai1-022 - PJM-AH2-416 | 450 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-416 - PJM-AG2-347 | 449 MW | Offshore Wind | DE | — | https://www.powerplantsinfo.org/project/pjm-ag2-347 - PJM-AI2-187 | 445 MW | Solar+Battery | WV | — | https://www.powerplantsinfo.org/project/pjm-ai2-187 - Ocean Wind LLC | 432 MW | Offshore Wind | NJ | — | https://www.powerplantsinfo.org/project/pjm-ae1-104-ocean-wind-llc - PJM-AG2-404 | 425 MW | Solar+Battery | WV | — | https://www.powerplantsinfo.org/project/pjm-ag2-404 - Brambleton-Goose Creek 500kV | 425 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-727-moved-to-tc2-brambleton-goose-creek-500kv - PJM-AH2-333 | 415 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah2-333 - West Lorain Power Plant 345 kV | 406 MW | Gas | OH | — | https://www.powerplantsinfo.org/project/pjm-ag1-500-west-lorain-power-plant-345-kv - PJM-AH2-257 | 400 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-257 - PJM-AH1-566 | 400 MW | Battery | PA | — | https://www.powerplantsinfo.org/project/pjm-ah1-566 - Silver Lake 345 kV | 400 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-545-moved-to-tc2-silver-lake-345-kv - Marysville-Flatlick 765 kV | 400 MW | Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-107-moved-to-tc2-marysville-flatlick-765-kv - PJM-AG2-570 | 400 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-570 - PJM-AG2-545 | 400 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-545 - Marysville-Flatlick 765 kV | 400 MW | Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-106-moved-to-tc2-marysville-flatlick-765-kv - PJM-AH2-352 | 400 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-352 - PJM-AG2-436 | 400 MW | Solar+Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-436 - Nottingham 138 kV | 400 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-580-moved-to-tc2-nottingham-138-kv - PJM-AG2-149 | 400 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-149 - PJM-AG2-104 | 400 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-104 - Heritage - Wake 500 kV | 400 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-570-moved-to-tc2-heritage-wake-500-kv - Oak Run Solar Project | 400 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag1-126-oak-run-solar-project - Oak Run Solar Project | 400 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag1-125-oak-run-solar-project - Nelson 345 kV | 391 MW | Gas | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-718-moved-to-tc2-nelson-345-kv - PJM-AH2-413 | 365 MW | Solar+Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-413 - PJM-AJ1-012 | 354 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-aj1-012 - Carson - Rogers Road 500 kV | 350 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-436-moved-to-tc2-carson-rogers-road-500-kv - PJM-AH2-414 | 350 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-414 - Panther Grove Wind | 350 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ae1-163-panther-grove-wind - PJM-AH2-340 | 350 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-340 - PJM-AG2-444 | 346 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-444 - Olive - Reynolds #2 345 kV | 338 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ah1-482-moved-to-tc2-olive-reynolds-2-345-kv - PJM-AG2-219 | 330 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-219 - Rockford II 138 kV | 330 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-564-moved-to-tc2-rockford-ii-138-kv - University Park 138 kV | 328 MW | Gas | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-567-moved-to-tc2-university-park-138-kv - PJM-AJ1-011 | 328 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-aj1-011 - Keydet Solar Center One | 320 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ac1-164-keydet-solar-center-one - PJM-AH2-150 | 320 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ah2-150 - PJM-AH1-528 | 301 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-528 - Rawlings - Unity 500 kV | 301 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-528-moved-to-tc2-rawlings-unity-500-kv - PJM-AI1-024 | 300 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ai1-024 - PJM-AI1-018 | 300 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ai1-018 - PJM-AI1-017 | 300 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ai1-017 - PJM-AF2-349 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-af2-349 - PJM-AH2-415 | 300 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-415 - PJM-AF2-407 | 300 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-af2-407 - PJM-AH2-334 | 300 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah2-334 - PJM-AH2-270 | 300 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-270 - PJM-AH2-133 | 300 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ah2-133 - PJM-AG1-118 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag1-118 - PJM-AH1-467 | 300 MW | Battery | KY | — | https://www.powerplantsinfo.org/project/pjm-ah1-467 - PJM-AH1-272 | 300 MW | Solar | MI | — | https://www.powerplantsinfo.org/project/pjm-ah1-272 - PJM-AH1-260 | 300 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-260 - PJM-AG1-297 | 300 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ag1-297 - PJM-AG1-302 | 300 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag1-302 - Jade Meadow III Solar Facility | 300 MW | Solar+Battery | MD | — | https://www.powerplantsinfo.org/project/pjm-ag1-363-jade-meadow-iii-solar-facility - PJM-AG1-374 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag1-374 - PJM-AG2-454 | 300 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-454 - PJM-AG1-410 | 300 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag1-410 - PJM-AG2-363 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-363 - PJM-AG2-053 | 300 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ag2-053 - PJM-AG2-029 | 300 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-029 - Macadamia Solar | 300 MW | Solar | NC | — | https://www.powerplantsinfo.org/project/pjm-ad1-074-macadamia-solar - Panther Grove 2 | 300 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ae1-113-panther-grove-2 - Cassius Blue Solar | 300 MW | Solar+Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ae2-094-cassius-blue-solar - Yellow Wood Solar Energy Center | 300 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ae2-221-yellow-wood-solar-energy-center - PJM-AF2-182 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-af2-182 - New Freedom - Monroe 230 kV | 300 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ah1-260-moved-to-tc2-new-freedom-monroe-230-kv - PJM-AF1-176 | 300 MW | Solar+Battery | MI | — | https://www.powerplantsinfo.org/project/pjm-af1-176 - Powerton 345 kV | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-363-moved-to-tc2-powerton-345-kv - PJM-AF2-041 | 300 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-af2-041 - PJM-AI2-443 | 300 MW | Solar+Battery | PA | — | https://www.powerplantsinfo.org/project/pjm-ai2-443 - PJM-AI1-203 | 300 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ai1-203 - Mammoth Central Energy Center | 300 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-af2-132-mammoth-central-energy-center - Mammoth South Energy Center | 300 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-af2-133-mammoth-south-energy-center - PJM-AE2-261 | 299 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ae2-261 - Firelands Wind | 298 MW | Wind | OH | — | https://www.powerplantsinfo.org/project/pjm-ac2-103-firelands-wind - PJM-AI1-085 | 290 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ai1-085 - PJM-AG1-553 | 284 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag1-553 - PJM-AG1-401 | 282 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ag1-401 - PJM-AI1-187 | 280 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai1-187 - PJM-AH2-342 | 280 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-342 - Lasalle - Plano 345 kV | 280 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-453-moved-to-tc2-lasalle-plano-345-kv - PJM-AG2-453 | 280 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-453 - PJM-AG2-455 | 280 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-455 - Olive - Reynolds 345 kV | 275 MW | Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ah1-302-moved-to-tc2-olive-reynolds-345-kv - Olive - Reynolds 345 kV | 275 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ah1-305-moved-to-tc2-olive-reynolds-345-kv - PJM-AG2-164 | 270 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-164 - Mayapple Solar | 260 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag1-349-mayapple-solar - PJM-AJ1-014 | 260 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-aj1-014 - PJM-AG1-462 | 255 MW | Solar | IL | — | https://www.powerplantsinfo.org/project/pjm-ag1-462 - PJM-AE1-172 | 255 MW | Wind | IL | — | https://www.powerplantsinfo.org/project/pjm-ae1-172 - PJM-AF1-204 | 255 MW | Wind | IN | — | https://www.powerplantsinfo.org/project/pjm-af1-204 - PJM-AH2-112 | 250 MW | Solar+Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ah2-112 - PJM-AH2-113 | 250 MW | Solar+Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah2-113 - Hardin Switch 345 kV | 250 MW | Solar | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-327-moved-to-tc2-hardin-switch-345-kv - PJM-AI1-149 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ai1-149 - Woods Landing Energy Storage | 250 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-af2-413-woods-landing-energy-storage - PJM-AF2-111 | 250 MW | Solar | KY | — | https://www.powerplantsinfo.org/project/pjm-af2-111 - PJM-AI2-068 | 250 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai2-068 - PJM-AI2-069 | 250 MW | Battery | NJ | — | https://www.powerplantsinfo.org/project/pjm-ai2-069 - PJM-AG2-360 | 250 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-360 - PJM-AG2-357 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ag2-357 - PJM-AI1-167 | 250 MW | Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-ai1-167 - PJM-AG2-163 | 250 MW | Solar+Battery | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-163 - PJM-AI1-040 | 250 MW | Solar | PA | — | https://www.powerplantsinfo.org/project/pjm-ai1-040 - PJM-AI1-172 | 250 MW | Solar+Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ai1-172 - PJM-AJ1-013 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-aj1-013 - Forest G. Hipple-Dunton Lake 345 kV | 250 MW | Solar | IN | — | https://www.powerplantsinfo.org/project/pjm-ag2-029-moved-to-tc2-forest-g-hipple-dunton-lake-345-kv - Heritage - Wake 500 kV | 250 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-069-moved-to-tc2-heritage-wake-500-kv - PJM-AH1-558 | 250 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ah1-558 - PJM-AH1-560 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-560 - PJM-AH1-561 | 250 MW | Battery | PA | — | https://www.powerplantsinfo.org/project/pjm-ah1-561 - Broadford 138 kV | 250 MW | Battery | VA | — | https://www.powerplantsinfo.org/project/pjm-ag2-360-moved-to-tc2-broadford-138-kv - PJM-AH1-562 | 250 MW | Battery | PA | — | https://www.powerplantsinfo.org/project/pjm-ah1-562 - PJM-AH1-563 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-563 - PJM-AH1-564 | 250 MW | Battery | IL | — | https://www.powerplantsinfo.org/project/pjm-ah1-564 - PJM-AH1-565 | 250 MW | Battery | OH | — | https://www.powerplantsinfo.org/project/pjm-ah1-565 - PJM-AH2-069 | 250 MW | Solar | VA | — | https://www.powerplantsinfo.org/project/pjm-ah2-069 - Maryland Offshore Wind Energy Project (MOWEP) | 248 MW | Offshore Wind | DE | — | https://www.powerplantsinfo.org/project/pjm-ab1-056-maryland-offshore-wind-energy-project-mowep - PJM-AI2-188 | 246 MW | Solar+Battery | WV | — | https://www.powerplantsinfo.org/project/pjm-ai2-188 (Showing top 200 by capacity. Full list crawlable from the human page.) ## See also - Operating fleet in PJM Interconnection: https://www.powerplantsinfo.org/llms-data/grid/pjm.txt - Per-project detail: https://www.powerplantsinfo.org/api/project/{slug}/text ## Citation Source: https://www.powerplantsinfo.org