Search plants, projects, owners, and states
7.6 MW Pet. Coke operating in Calhoun, TX — Electric Reliability Council of Texas, Inc.
7.6 MW
Nameplate Capacity
1
Generators
unit
Petroleum Coke
Technology
1983
Operating Since
Coordinates
28.5139, -96.7942
County
Calhoun, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Seadrift Coke L P | — | — |
| Owner(s) | Seadrift Coke L P | — | — |
| Status | Operating | — | — |
Seadrift Coke LP is a 7.6 MW power plant located in Calhoun County, Texas. The plant began operating in 1983 and is owned and operated by Seadrift Coke L P. The primary fuel source for the plant is petroleum coke (PC), and it utilizes one generator. Seadrift Coke LP operates within the Electric Reliability Council of Texas (ERCOT) balancing authority.
In the most recent year with available data, the plant generated 32,945 MWh of electricity, achieving a capacity factor of 49.5%. Seadrift Coke LP is ranked as the second-largest of three petroleum coke plants in Texas, and fifth-largest of seven such plants nationally. The plant is located within the Texas Regional Entity (TRE) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
1.1K MWh
Latest Month
32.9K MWh
Annual Generation
49.5%
Capacity Factor
CO₂ Intensity
1577 lb/MWh
NOx
4 lb/MWh
SO₂
No financial data available for this plant.
This is a small open-data project — if you have sources or want more coverage here, drop a note.
Point of Interconnection
Nearest Substation
Airco Substation · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
South Zone Node
Pricing Hub
HB_SOUTH
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Seadrift Coke LPElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
200.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
12 lb/MWh
CH₄
0.037 lb/MWh
N₂O
0.007 lb/MWh
Capacity Factor
26.1%
Annual Net Gen
17 GWh
CO₂eq
1580 lb/MWh
Subregion
ERCOT All