Search plants, projects, owners, and states
5.4 MW Hydro operating in Grayson, VA — PJM Interconnection, LLC
5.4 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1933
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Central Rivers Power US, LLC | — | — |
| Owner(s) | Central Rivers Power US, LLC | — | — |
| Status | Operating | — | — |
The Fries Hydroelectric Project is a 5.4 MW hydroelectric power plant located in Grayson County, Virginia. The plant began operating in 1933 and consists of four generators utilizing conventional hydroelectric technology. It is owned and operated by Central Rivers Power US, LLC.
The Fries plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is the 13th largest of 25 hydroelectric plants in Virginia, and ranks 857th out of 1464 hydroelectric plants nationally. The plant's primary fuel source is water (WAT).
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $12.4M
Point of Interconnection
Nearest Substation
Fries Substation · 69 kV
Substation Distance
0.04 km
Operator
Appalachian Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
FRIES 12 KV FRIESHYD
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Fries Hydroelectric ProjectPJM Interconnection, LLC (PJM)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP