7.5 MW Hydro operating in Menominee, MI — Midcontinent Independent Transmission System Operator, Inc..
7.5 MW
Nameplate Capacity
5
Generators
units
Conventional Hydroelectric
Technology
1918
Operating Since
Coordinates
45.3547, -87.6493
County
Menominee, MI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wisconsin Public Service Corp | Wisconsin Public Service | — |
| Owner(s) | Wisconsin Public Service Corp | WEC Energy Group | — |
| Status | Operating | — | — |
The Grand Rapids hydroelectric plant is located in Menominee County, Michigan. The plant has a total capacity of 7.5 MW across 5 generators, and it began operating in 1918. The primary fuel source is water. The plant is owned by WEC Energy Group and operated by Wisconsin Public Service Corp. It ranks 18th out of 50 power plants in Michigan and 761st out of 1464 plants nationally.
Grand Rapids operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. The latest annual generation data shows an output of 31,863 MWh, resulting in a capacity factor of 48.4%. Financial data indicates an installed cost of $709 per kW, as reported to FERC.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
2.3K MWh
Latest Month
31.9K MWh
Annual Generation
48.4%
Capacity Factor
Hydroelectric · Wisconsin Public Service Corporation · Data from 2017–2024
$1,162/kW
Installed Cost
$19.2/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Grand Rapids Substation
Substation Distance
< 10 km
Operator
Wisconsin Public Service Corporation
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
WPS.WPSM
Pricing Hub
MICHIGAN.HUB
Location Type
Load Zone
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Grand RapidsMidcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
24.9 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility