Search plants, projects, owners, and states
90 MW Natural Gas Fired Combustion Turbine (80 MW) + Petroleum Liquids (10 MW) operating in Livingston, MO — Southwest Power Pool
90 MW
Nameplate Capacity
7
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Petroleum Liquids
1986
Operating Since
Coordinates
39.7831, -93.5643
County
Livingston, MO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Chillicothe Municipal Utils (MO) | — | — |
| Owner(s) | Chillicothe Municipal Utils | — | — |
| Status | Operating | — | — |
The Chillicothe power plant, located in Livingston County, Missouri, has a total capacity of 90 MW across 7 generators. The plant began operating in 1986 and is owned and operated by Chillicothe Municipal Utilities. While the primary fuel is distillate fuel oil (DFO), the plant utilizes both natural gas-fired combustion turbine and petroleum liquids technologies, classifying it as a hybrid facility.
Chillicothe operates within the Southwest Power Pool (SPP) balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 4,445 MWh, achieving a capacity factor of 0.6%. Chillicothe holds a notable ranking within Missouri, standing as the 2nd largest power plant out of 38 in the state. Nationally, it is ranked 67 out of 886 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
4.4K MWh
Annual Generation
0.6%
Capacity Factor
CO₂ Intensity
0 lb/MWh
NOx
13 lb/MWh
SO₂
2 lb/MWh
CH₄
0.021 lb/MWh
N₂O
0.004 lb/MWh
Capacity Factor
1.1%
Annual Net Gen
9 GWh
CO₂eq
2 lb/MWh
Subregion
SPP North
2013
$765/kW
Est. Construction Cost
Total estimated cost: $68.8M
Point of Interconnection
Nearest Substation
Chillicothe
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
MO.AE.CHIL2.MP
Pricing Hub
SPP South Hub
Alt. Hub / Zone
SPP North Hub
Location Type
Settlement Location
Node Source
Curated node match
Last updated 2026-03-14
View all articlesNo ask pi reports yet for this entity.
ask pi about Chillicothe