Search plants, projects, owners, and states
3.6 MW Hydro operating in Guadalupe, TX — Electric Reliability Council of Texas, Inc.
3.6 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1927
Operating Since
Coordinates
29.6401, -98.0460
County
Guadalupe, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Guadalupe Blanco River Authority | — | — |
| Owner(s) | Guadalupe Blanco River Authority | — | — |
| Status | Operating | — | — |
Dunlap TP 1 is a hydroelectric power plant located in Guadalupe County, Texas. The plant has a total capacity of 3.6 MW across two generators and is owned and operated by Guadalupe Blanco River Authority. Commissioned in 1927, the plant utilizes water as its primary fuel source and employs conventional hydroelectric technology. It operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region.
In terms of its relative size, Dunlap TP 1 is ranked as the 17th largest hydroelectric plant out of 24 in Texas, and 992nd nationally out of 1464 plants. The plant's latest annual generation was 4,432 MWh, resulting in a capacity factor of 14.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
193 MWh
Latest Month
4.4K MWh
Annual Generation
14.0%
Capacity Factor
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $8.3M
Point of Interconnection
Nearest Substation
Clear Springs Substation · 345 kV
Substation Distance
3.07 km
Operator
Lower Colorado River Authority
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CACH_ESS_RN
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Dunlap TP 1Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility