27.5 MW Hydro operating in Lewis, WA — Bonneville Power Administration
27.5 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1964
Operating Since
Coordinates
46.6040, -121.6587
County
Lewis, WA
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Energy Northwest - Packwood | — | — |
| Owner(s) | Energy Northwest | — | — |
| Status | Operating | — | — |
The Packwood Hydroelectric Project, plant ID 3929, is a 27.5 MW conventional hydroelectric facility located in Lewis County, Washington. The plant began operating in 1964 and has one generator. Energy Northwest is the owner and operator.
Packwood's latest annual generation was 62,999 MWh, resulting in a capacity factor of 26.2%. The plant is located within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Packwood ranks 38th out of 75 power plants in Washington and 426th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
5.2K MWh
Latest Month
63.0K MWh
Annual Generation
26.2%
Capacity Factor
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $63.1M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about PackwoodBonneville Power Administration (BPAT)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
—
Sector
Electric Utility