Search plants, projects, owners, and states
5.9 MW Distillate Oil operating in Kings, NY — New York Independent System Operator
5.9 MW
Nameplate Capacity
6
Generators
units
Petroleum Liquids
Technology
2006
Operating Since
Coordinates
40.6679, -73.9787
County
Kings, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NewYork-Presbyterian Brooklyn Methodist Hospital | — | — |
| Owner(s) | NewYork-Presbyterian Brooklyn Methodist Hospital | — | — |
| Status | Operating | — | — |
NewYork-Presbyterian Brooklyn Methodist is a 5.9 MW power plant located in Kings County, New York. The plant began operating in 2006 and is owned and operated by NewYork-Presbyterian Brooklyn Methodist Hospital. It consists of six generators utilizing petroleum liquids, specifically distillate fuel oil (DFO), as its primary fuel source. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year of data, the plant generated 25 MWh of electricity, resulting in a capacity factor of 0.0%. Based on its total capacity, NewYork-Presbyterian Brooklyn Methodist ranks as the 29th largest power plant out of 66 in New York state, and 496th out of 886 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
480.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
7 MWh
Latest Month
25 MWh
Annual Generation
0.0%
Capacity Factor
CO₂ Intensity
3447 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
4 lb/MWh
SO₂
6 lb/MWh
CH₄
0.052 lb/MWh
N₂O
0.006 lb/MWh
Capacity Factor
0.1%
Annual Net Gen
0 GWh
CO₂eq
3450 lb/MWh
Subregion
NPCC NYC/Westchester
2013
$765/kW
Est. Construction Cost
Total estimated cost: $4.5M
Point of Interconnection
Nearest Substation
BROOKLYN___ARMY_DRP
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone J
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about NewYork-Presbyterian Brooklyn Methodist