285.6 MW Natural Gas operating in Clinton, NY — New York Independent System Operator
285.6 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
1994
Operating Since
Coordinates
44.7132, -73.4557
County
Clinton, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Saranac Power Partners LP | Saranac Power Partners | — |
| Owner(s) | Saranac Power Partners LP | Berkshire Hathaway | — |
| Status | Operating | — | — |
The Saranac Facility is a 285.6 MW natural gas-fired combined cycle power plant located in Clinton County, New York. The plant began operating in 1994 and consists of 3 generators. It is owned by Berkshire Hathaway and operated by Saranac Power Partners LP.
The facility operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of reported generation data, the plant produced 354,885 MWh of electricity, achieving a capacity factor of 14.1%. The Saranac Facility ranks as the 24th largest power plant in New York out of 38, and 659th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
59.2K MWh
Latest Month
354.9K MWh
Annual Generation
14.1%
Capacity Factor
CO₂ Intensity
1202 lb/MWh
NOx
0.276 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.021 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
9.4%
Annual Net Gen
234 GWh
CO₂eq
1203 lb/MWh
Subregion
NPCC Upstate NY
2013
$965/kW
Est. Construction Cost
Total estimated cost: $275.6M
Point of Interconnection
Nearest Substation
FALCON___SEABRD_CC1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
NYSEG Northend
Pricing Hub
NYISO Zone D
Node Source
Shared substation inference
Last updated 2026-03-14