9.2 MW Landfill Gas operating in Strafford, NH — ISO New England Inc.
9.2 MW
Nameplate Capacity
6
Generators
units
Landfill Gas
Technology
1992
Operating Since
Coordinates
43.2417, -70.9669
County
Strafford, NH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Turnkey Landfill Gas Recovery is a 9.2 MW landfill gas-fueled power plant located in Strafford County, New Hampshire. The plant, which began operating in 1992, is owned by Waste Management and operated by WM Renewable Energy LLC. It consists of six generators utilizing landfill gas technology. The plant is within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In its latest year of operation, Turnkey Landfill Gas Recovery generated 44,163 MWh of electricity, achieving a capacity factor of 54.7%. The plant is ranked as the largest of three landfill gas power plants in the state of New Hampshire, and 44th out of 284 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
35.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
3.6K MWh
Latest Month
44.2K MWh
Annual Generation
54.7%
Capacity Factor
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.571 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
55.6%
Annual Net Gen
45 GWh
CO₂eq
0.000 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $32.2M
Market Position
ISO/RTO Market
ISO-NE
LMP Node
SESD # 496
Pricing Hub
.Z.NEWHAMPSHIRE
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Turnkey Landfill Gas Recovery