300.4 MW Natural Gas operating in Louisa, VA — PJM Interconnection, LLC
300.4 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combined Cycle
Technology
1994
Operating Since
Coordinates
38.1247, -78.2035
County
Louisa, VA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Virginia Electric & Power Co | Virginia Electric and Power | — |
| Owner(s) | Virginia Electric & Power Co | Dominion Energy | — |
| Status | Operating | — | — |
Gordonsville Energy LP is a 300.4 MW natural gas-fired combined cycle power plant located in Louisa County, Virginia. The plant began operating in 1994 and consists of 4 generators. It is owned by Dominion Energy and operated by Virginia Electric & Power Co. Gordonsville Energy is connected to the PJM Interconnection, LLC balancing authority and is within the SERC NERC region.
In the most recent year of data, the plant generated 1,386,871 MWh of electricity, achieving a capacity factor of 52.6%. According to available data, the installed cost of the plant was $178.56 per kW, based on FERC filings. Gordonsville Energy LP is ranked as the 18th largest power plant out of 20 in Virginia, and 642nd out of 945 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
151.5K MWh
Latest Month
1.4M MWh
Annual Generation
52.6%
Capacity Factor
CO₂ Intensity
1002 lb/MWh
NOx
0.226 lb/MWh
SO₂
0.005 lb/MWh
CH₄
0.019 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
34.9%
Annual Net Gen
918 GWh
CO₂eq
1003 lb/MWh
Subregion
SERC Virginia/Carolina
Combined cycle · VIRGINIA ELECTRIC AND POWER COMPANY · Data from 2015–2024
$236/kW
Installed Cost
$4/kW
Annual CapEx
$11.1/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
Shared substation inference
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Gordonsville Energy LP