230.4 MW Natural Gas operating in Jefferson, AR — Midcontinent Independent Transmission System Operator, Inc..
230.4 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combined Cycle
Technology
2001
Operating Since
Coordinates
34.2181, -91.9025
County
Jefferson, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pine Bluff Energy LLC | Pine Bluff Energy | — |
| Owner(s) | Pine Bluff Energy LLC | Constellation Energy | — |
| Status | Operating | — | — |
Pine Bluff Energy Center is a 230.4 MW natural gas-fired combined cycle power plant located in Jefferson County, Arkansas. The plant began operating in 2001 and consists of two generators. It is owned by Constellation Energy and operated by Pine Bluff Energy LLC. The plant is located within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC Reliability Corporation (SERC) NERC region.
In the most recent year of data, Pine Bluff Energy Center generated 1,113,270 MWh of electricity, achieving a capacity factor of 55.3%. The plant ranks as the 9th largest in Arkansas out of 12 plants, and 717th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
131.4K MWh
Latest Month
1.1M MWh
Annual Generation
55.3%
Capacity Factor
CO₂ Intensity
677 lb/MWh
NOx
0.261 lb/MWh
SO₂
0.003 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
60.1%
Annual Net Gen
1213 GWh
CO₂eq
678 lb/MWh
Subregion
SERC Mississippi Valley
2013
$965/kW
Est. Construction Cost
Total estimated cost: $222.4M
Market Position
ISO/RTO Market
MISO
LMP Node
EAI.PBENRGY_CT
Pricing Hub
ARKANSAS.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Pine Bluff Energy Center