1 MW Distillate Oil operating in Rutherford, NC — Duke Energy Carolinas
1 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
2007
Operating Since
Coordinates
35.3619, -81.8344
County
Rutherford, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina Mun Power Agny #1 | — | — |
| Owner(s) | North Carolina Mun Power Agny #1 | — | — |
| Status | Operating | — | — |
Bostic Delivery No 2 is a 1 MW petroleum-fueled power plant located in Rutherford County, North Carolina. The plant began operating in 2007 and has one generator utilizing petroleum liquids technology. It is owned and operated by North Carolina Municipal Power Agency #1.
The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. Bostic Delivery No 2 is ranked as the 45th largest power plant in North Carolina out of 45 plants, and 874th nationally out of 886 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
2013
$765/kW
Est. Construction Cost
Total estimated cost: $765K
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Bostic Delivery No 2Duke Energy Carolinas (DUK)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility