1 MW Solar operating in Riverside, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2007
Operating Since
Coordinates
33.8672, -117.2300
County
Riverside, CA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunE WG113 Moreno Valley LLC | SunE WG113 Moreno Valley | — |
| Owner(s) | SunE WG113 Moreno Valley LLC | WF-SE-1 Solar Statutory Trust | — |
| Status | Operating | operating | — |
GEM identifies the owner as WF-SE-1 Solar Statutory Trust
This entity is not yet in the GEM ownership database — chain unavailable.
The SunEdison Walgreens Moreno Valley is a 1 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2007 and is owned and operated by SunE WG113 Moreno Valley LLC. It consists of a single generator utilizing single-axis tracking to maximize solar energy capture. The plant's primary fuel source is solar energy (SUN).
The facility operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the SunEdison Walgreens Moreno Valley plant is ranked 770 out of 862 solar plants in California, and 6337 out of 7108 nationally. The latest annual generation data indicates an output of 900 MWh, resulting in a capacity factor of 10.2%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
29 MWh
Latest Month
900 MWh
Annual Generation
10.2%
Capacity Factor
2013
$3,757/kW
Est. Construction Cost
Total estimated cost: $3.8M
Market Position
ISO/RTO Market
CAISO
LMP Node
KARMA_1_N004
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about SunEdison Walgreens Moreno Valley