Search plants, projects, owners, and states
3.2 MW Landfill Gas operating in Comal, TX — Electric Reliability Council of Texas, Inc.
3.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2010
Operating Since
Coordinates
29.7372, -98.0228
County
Comal, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
The Mesquite Creek LFGTE Project is a 3.2 MW landfill gas-to-energy (LFGTE) plant located in Comal County, Texas. The plant began operating in 2010 and utilizes landfill gas as its primary fuel source. It consists of two generators and is owned by Waste Management, with WM Renewable Energy LLC listed as the operator. The plant's location places it within the Electric Reliability Council of Texas (ERCOT) balancing authority.
In terms of its contribution to the state's energy mix, the Mesquite Creek LFGTE Project ranks as the 5th largest of 7 landfill gas plants in Texas. Nationally, it ranks 175th out of 284 similar facilities. The plant's latest annual generation was 23,856 MWh, achieving a capacity factor of 84.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
2.0K MWh
Latest Month
23.9K MWh
Annual Generation
84.9%
Capacity Factor
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.370 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
76.2%
Annual Net Gen
21 GWh
CO₂eq
0.000 lb/MWh
Subregion
ERCOT All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Point of Interconnection
Nearest Substation
Henne Substation · 138 kV
Substation Distance
< 10 km
Operator
New Braunfels Utilities
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ZONAL
Pricing Hub
HB_SOUTH
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Mesquite Creek LFGTE Project