74 MW Wind operating in Herkimer, NY — New York Independent System Operator
74 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
43.1351, -74.8929
County
Herkimer, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Hardscrabble Wind Power LLC is a 74 MW wind power plant located in Herkimer County, New York. The plant began operating in 2011 and is owned by Avangrid, with Avangrid Power LLC as the operator. The facility consists of a single generator utilizing onshore wind turbine technology. The plant uses Gamesa G90-2.0 wind turbines, with a rotor diameter of 90 meters and a hub height of 100 meters.
The plant's latest annual generation was 163,781 MWh, resulting in a capacity factor of 25.2%. Hardscrabble Wind Power operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 32nd out of 45 wind plants in New York and 846th out of 1424 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
16.3K MWh
Latest Month
163.8K MWh
Annual Generation
25.2%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $140.2M
Point of Interconnection
Nearest Substation
HARDSCRABBLE_WT_PWR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.