252 MW Wind operating in Lincoln, CO — Public Service Company of Colorado
252 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
39.4218, -103.6781
County
Lincoln, CO
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cedar Point LLC | Enbridge | — |
| Owner(s) | Cedar Point LLC, Clover US Blocker LLC | Enbridge | — |
| Status | Operating | operating | — |
Cedar Point Wind Farm is a 252.3 megawatt (MW) wind farm in eastern Colorado, United States, north of the town of Limon. It was the second largest wind facility in the state when it was completed in 2011. The electricity is being sold to Xcel Energy under a 20-year power purchase agreement.
Read more on WikipediaCedar Point Wind is a 252 MW wind power plant located in Lincoln County, Colorado. The facility began operating in 2011 and is owned by Enbridge, a Canadian company. Cedar Point LLC is the listed operator per the EIA. The plant utilizes onshore wind turbine technology, consisting of a single generator. It ranks as the 6th largest wind farm in Colorado out of 21, and 158th nationally out of 734.
The plant's turbines have a hub height of 80 meters and a rotor diameter of 90 meters. The turbines were manufactured by Vestas, model V90-1.8. In the most recent year of data, Cedar Point Wind generated 692,569 MWh of electricity, achieving a capacity factor of 31.3%. The balancing authority for the plant is Public Service Company of Colorado, and it resides within the WECC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
68.5K MWh
Latest Month
692.6K MWh
Annual Generation
31.3%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $477.6M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Cedar Point WindPublic Service Company of Colorado (PSCO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP