24.6 MW Wind operating in Denali, AK — No BA
24.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2013
Operating Since
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Golden Valley Elec Assn Inc | Golden Valley Electric Association | — |
| Owner(s) | Golden Valley Elec Assn Inc | Golden Valley Electric Association | — |
| Status | Operating | operating | — |
Eva Creek Wind is a 24.6 MW wind power plant located in Denali County, Alaska. The facility, which began operating in 2013, is owned and operated by Golden Valley Electric Association. It is the largest of four wind plants in the state. The plant utilizes a single onshore wind turbine manufactured by REpower, model MM92, with a rotor diameter of 92.5 meters and a hub height of 78.5 meters.
In its most recent year of operation, Eva Creek Wind generated 39,657 MWh of electricity, achieving a capacity factor of 18.4%. The plant operates outside of any organized ISO/RTO market and its balancing authority is listed as "No BA".
Generated from EIA, GEM, and public data sources
Grid Region
Non-ISO
Market
—
NERC Region
—
Balancing Authority
3.2K MWh
Latest Month
39.7K MWh
Annual Generation
18.4%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $46.6M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Eva Creek WindNo BA
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility