5.2 MW Solar operating in Mercer, NJ — PJM Interconnection, LLC
5.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
40.2996, -74.7198
County
Mercer, NJ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CVI CleanCapital Solar 4 LLC | CVI CleanCapital Solar 4 | — |
| Owner(s) | KDC Solar TLS LLC | KDC Solar TLS LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as KDC Solar TLS LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Lawrenceville School Solar Facility is a 5.2 MW solar photovoltaic plant located in Mercer County, New Jersey. The plant began operating in 2012 and is owned and operated by CVI CleanCapital Solar 4 LLC. It utilizes single-axis tracking to maximize solar energy capture. The facility is connected to the PJM Interconnection, LLC balancing authority within the RFC NERC region.
In its most recent year of operation, the Lawrenceville School Solar Facility generated 6,659 MWh of electricity, achieving a capacity factor of 14.6%. The plant ranks 67th out of 328 solar facilities in New Jersey and 2202nd nationally out of 7108 plants. Financial data for the facility is available from LBNL Solar.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
236 MWh
Latest Month
6.7K MWh
Annual Generation
14.6%
Capacity Factor
Data from 2012–2024
$28.2/MWh
Energy Value
$6.4/MWh
Capacity Value
Point of Interconnection
Nearest Substation
BMS Lawrenceville Substation · 69 kV
Substation Distance
3.325 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
CLARKSVI230 KV CLARKSP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about The Lawrenceville School Solar Facility