10.9 MW Solar operating in Imperial, CA — Imperial Irrigation District
10.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
32.7126, -115.5404
County
Imperial, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Axium US Solar Holdings LLC | Axium US Solar Holdings | — |
| Owner(s) | Axium US Solar Holdings LLC | — | — |
| Status | Operating | operating | — |
Heber Solar is a 10.9 MW solar photovoltaic power plant located in Imperial County, California. The plant began operating in 2014 and is owned and operated by Axium US Solar Holdings LLC. It utilizes a single-axis tracking system to maximize solar energy capture. As of the most recent data, Heber Solar generated 24,591 MWh annually, achieving a capacity factor of 25.7%.
Heber Solar operates within the Imperial Irrigation District balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 233rd out of 862 solar facilities in California and 1770th nationally out of 7108. Financial data is available for Heber Solar, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
1.1K MWh
Latest Month
24.6K MWh
Annual Generation
25.7%
Capacity Factor
Data from 2014–2024
$11.2/MWh
Energy Value
$11.3/MWh
Capacity Value
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Heber SolarImperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP