1.3 MW Solar operating in Butte, CA — California Independent System Operator
1.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
39.2918, -121.6700
County
Butte, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solarenewal LLC | Solarenewal | — |
| Owner(s) | Solarenewal LLC | — | — |
| Status | Operating | operating | — |
The 2127 Harris Solar Project is a 1.3 MW solar photovoltaic power plant located in Butte County, California. The plant began operating in 2014 and has one generator. It is owned and operated by Solarenewal LLC. The plant utilizes single-axis tracking to maximize solar energy capture.
In the most recent year of data, the plant generated 1,498 MWh of electricity, resulting in a capacity factor of 13.1%. The 2127 Harris Solar Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 672nd in size among California power plants and 6099th nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
20 MWh
Latest Month
1.5K MWh
Annual Generation
13.1%
Capacity Factor
Data from 2015–2024
$31.4/MWh
Energy Value
$18.7/MWh
Capacity Value
Market Position
ISO/RTO Market
CAISO
LMP Node
LIVEOAK_7_N004
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about 2127 Harris Solar ProjectCalifornia Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP