Search plants, projects, owners, and states
4.9 MW Solar operating in Pender, NC — Duke Energy Carolinas
4.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
34.6135, -77.9299
County
Pender, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bearford Solar II, LLC | Bearford Solar II | — |
| Owner(s) | Bearford Solar II, LLC | — | — |
| Status | Operating | operating | — |
Bearford Solar II is a 4.9 MW solar photovoltaic power plant located in Pender County, North Carolina. The plant began operating in 2018 and is owned and operated by Bearford Solar II, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, Bearford Solar II generated 7,696 MWh of electricity, achieving a capacity factor of 17.9%. The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. In terms of size, Bearford Solar II ranks as the 531st largest power plant in North Carolina out of 770, and 3112th nationally out of 7108.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
643 MWh
Latest Month
7.7K MWh
Annual Generation
17.9%
Capacity Factor
Data from 2019–2024
$22.7/MWh
Energy Value
$30.3/MWh
Capacity Value
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Bearford Solar IIDuke Energy Carolinas (DUK)
Grid Voltage
22.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP