Search plants, projects, owners, and states
30 MW Solar operating in Imperial, CA — Imperial Irrigation District
30 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
33.1094, -116.0033
County
Imperial, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Renewables Services | Duke Energy | — |
| Owner(s) | Seville Solar Two, LLC | Duke Energy | — |
| Status | Operating | operating | — |
Seville 2 is a 30 MW solar photovoltaic power plant located in Imperial County, California. The plant, which began operating in 2015, utilizes single-axis tracking technology. It is owned by Duke Energy and operated by Duke Energy Renewables Services. Seville 2 is connected to the Imperial Irrigation District balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 97th out of 862 power plants in California and 1297th out of 7108 plants nationally.
In its most recent year of operation, Seville 2 generated 77,500 MWh of electricity, achieving a capacity factor of 29.4%. The plant has a reported power purchase agreement (PPA) price of $68.88 per MWh, according to data from Lawrence Berkeley National Laboratory (LBNL).
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
3.7K MWh
Latest Month
77.5K MWh
Annual Generation
29.4%
Capacity Factor
Data from 2015–2024
$11.3/MWh
Energy Value
$11.0/MWh
Capacity Value
Market Position
LMP Node
Imperial Valley 230 bus
Pricing Hub
—
Last updated 2026-03-14
View all articlesNo ask pi reports yet for this entity.
ask pi about Seville 2Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP