20 MW Solar operating in Warren, NC — PJM Interconnection, LLC
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
36.5167, -78.0325
County
Warren, NC
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Five Forks Solar | BayWa R.E. | — |
| Owner(s) | Five Forks Solar | Public Service Enterprise Group (PSEG) Solar Source | — |
| Status | Operating | operating | — |
GEM identifies the owner as Public Service Enterprise Group (PSEG) Solar Source
This entity is not yet in the GEM ownership database — chain unavailable.
Five Forks Solar is a 20 MW solar photovoltaic power plant located in Warren County, North Carolina. The plant began operating in 2019 and has one generator. It is owned and operated by Five Forks Solar. The primary fuel source is solar energy. The plant's solar tracking technology is single-axis. Five Forks Solar is connected to the PJM Interconnection, LLC balancing authority and is within the SERC NERC region. It is ranked as the 73rd largest solar plant in North Carolina out of 770, and 1408th nationally out of 7108.
In its most recent year of operation, Five Forks Solar generated 26,847 MWh of electricity, achieving a capacity factor of 15.3%. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
1.5K MWh
Latest Month
26.8K MWh
Annual Generation
15.3%
Capacity Factor
Data from 2019–2024
$27.4/MWh
Energy Value
$3.9/MWh
Capacity Value
Market Position
ISO/RTO Market
PJM
LMP Node
FIVEFRKS115 KV HEC
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Five Forks SolarPJM Interconnection, LLC (PJM)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP