3 MW Solar operating in Beaver, UT — PacifiCorp - East
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
38.3849, -112.9839
County
Beaver, UT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunE DB24 LLC | SunE DB24 | — |
| Owner(s) | SunE DB24 LLC | — | — |
| Status | Operating | operating | — |
Milford 2 is a 3 MW solar photovoltaic power plant located in Beaver County, Utah. The plant, which began operating in 2015, is owned and operated by SunE DB24 LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. Milford 2 is interconnected to the grid within the PacifiCorp - East balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Milford 2 generated 6,983 MWh of electricity, achieving a capacity factor of 26.5%. The plant is ranked as the 43rd largest solar facility in Utah out of 58, and nationally it ranks 4016 out of 7108 solar plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
333 MWh
Latest Month
7.0K MWh
Annual Generation
26.5%
Capacity Factor
Data from 2016–2024
$15.6/MWh
Energy Value
$13.1/MWh
Capacity Value
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Milford 2PacifiCorp - East (PACE)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP