200 MW Wind operating in Mills, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2018
Operating Since
Coordinates
31.6320, -98.5683
County
Mills, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | BHE Renewables, LLC | BHE Renewables | — |
| Owner(s) | BHE Renewables, LLC | Berkshire Hathaway | — |
| Status | Operating | operating | — |
Flat Top Wind I is a 200 MW wind power plant located in Mills County, Texas. The facility began operating in 2018 and utilizes onshore wind turbine technology. It consists of a single generator and is owned by Berkshire Hathaway, with BHE Renewables, LLC as the operator. The plant uses Vestas V110-2.0 wind turbines, which have a rotor diameter of 110 meters and a hub height of 95 meters.
The plant's latest annual generation was 786,606 MWh, resulting in a capacity factor of 44.9%. Flat Top Wind I operates within the Electric Reliability Council of Texas, Inc. balancing authority and the TRE NERC region. It is ranked as the 103rd largest wind farm in Texas out of 200, and 323rd nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
78.0K MWh
Latest Month
786.6K MWh
Annual Generation
44.9%
Capacity Factor
2018
$1,183/kW
Est. Construction Cost
Total estimated cost: $236.6M
Point of Interconnection
Nearest Substation
Tater Hill Substation · 345 kV
Substation Distance
0 km
Operator
Innergex;BlackRock
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
FTWIND_UNIT1
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.