3 MW Solar operating in Stearns, MN — Midcontinent Independent Transmission System Operator, Inc..
3 MW
Nameplate Capacity
3
Generators
units
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
45.6652, -94.2244
County
Stearns, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Minnesota Solar CSG 21, LLC | Minnesota Solar CSG 21 | — |
| Owner(s) | Minnesota Solar CSG 21, LLC | — | — |
| Status | Operating | operating | — |
The B.R. Sartell CSG is a 3 MW solar photovoltaic power plant located in Stearns County, Minnesota. The plant began operating in 2017 and is owned and operated by Minnesota Solar CSG 21, LLC. It consists of three generators utilizing fixed-tilt solar tracking technology.
In its most recent year of operation, the B.R. Sartell CSG generated 3,920 MWh of electricity, achieving a capacity factor of 14.9%. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid, and falls within the MRO NERC region. Based on capacity, the B.R. Sartell CSG ranks as the 153rd largest solar plant in Minnesota out of 540, and 4022nd nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
48 MWh
Latest Month
3.9K MWh
Annual Generation
14.9%
Capacity Factor
Data from 2018–2024
$27.1/MWh
Energy Value
$2.7/MWh
Capacity Value
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about B.R. Sartell CSGMidcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector