1.9 MW Natural Gas Internal Combustion Engine (0 MW) + Petroleum Liquids (2 MW) standby in Rockland, NY — New York Independent System Operator
1.9 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Internal Combustion Engine + Petroleum Liquids
1980
Operating Since
Coordinates
41.1115, -74.1354
County
Rockland, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Good Samaritan Hospital | — | — |
| Owner(s) | Good Samaritan Hospital | — | — |
| Status | Standby | — | — |
Good Samaritan Hospital is a 1.9 MW hybrid power plant located in Rockland County, New York. The facility, which began operating in 1980, is owned and operated by Good Samaritan Hospital. The plant utilizes both natural gas internal combustion engines and petroleum liquids as fuel sources, with distillate fuel oil (DFO) listed as the primary fuel. It consists of three generators.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Good Samaritan Hospital ranks 49th out of 66 power plants in New York and 758th nationally out of 886 plants. The latest annual generation data indicates an output of 25 MWh, resulting in a capacity factor of 0.1%.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
7 MWh
Latest Month
25 MWh
Annual Generation
0.1%
Capacity Factor
CO₂ Intensity
1309 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
28 lb/MWh
SO₂
2 lb/MWh
CH₄
0.053 lb/MWh
N₂O
0.010 lb/MWh
Capacity Factor
0.3%
Annual Net Gen
0 GWh
CO₂eq
1313 lb/MWh
Subregion
NPCC Upstate NY
2013
$765/kW
Est. Construction Cost
Total estimated cost: $1.5M
Point of Interconnection
Nearest Substation
HILLBURN___GT
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone G
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Good Samaritan Hospital