Search plants, projects, owners, and states
12 MW Hydro planned in Greene, PA — PJM Interconnection, LLC
12 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
39.8237, -79.9230
County
Greene, PA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Grays Landing L&D Hydroelectric Project is a 12 MW hydroelectric power plant located in Greene County, Pennsylvania. The plant utilizes conventional hydroelectric technology and consists of two generators. It is owned and operated by Rye Development. The plant's primary fuel source is water (WAT).
Grays Landing operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 17th largest hydroelectric plant in Pennsylvania out of 28 such facilities, and ranks 619th nationally out of 1464 hydroelectric plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
No generation data available for this plant.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $17.0M
Market Position
ISO/RTO Market
PJM
LMP Node
RONCO 18 KV CT2
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Grays Landing L&D Hydroelectric ProjectPJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP