9 MW Hydro planned in Allegheny, PA — PJM Interconnection, LLC
9 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
40.8944, -79.9136
County
Allegheny, PA
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Allegheny L&D2 Hydroelectric Project is a 9 MW hydroelectric power plant located in Allegheny County, Pennsylvania. The plant utilizes conventional hydroelectric technology and consists of two generators. It is owned and operated by Rye Development. The plant's primary fuel source is water (WAT).
The Allegheny L&D2 Hydroelectric Project operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, it ranks as the 22nd largest hydroelectric plant out of 28 in Pennsylvania, and 688th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
No generation data available for this plant.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $12.7M
Market Position
ISO/RTO Market
PJM
LMP Node
SHANORMA138 KV T61
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Allegheny L&D2 Hydroelectric ProjectPJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP