5 MW Hydro planned in DeSoto, MS — Tennessee Valley Authority
5 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
34.7579, -90.1257
County
DeSoto, MS
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Arkabutla Lake Hydroelectric Project is a 5 MW hydroelectric power plant located in DeSoto County, Mississippi. The plant utilizes conventional hydroelectric technology and consists of two generators. It is owned and operated by Rye Development. The plant's primary fuel source is water (WAT).
The Arkabutla Lake Hydroelectric Project operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. It is ranked as the third largest of four hydroelectric plants in Mississippi, and 890th out of 1464 hydroelectric plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
No generation data available for this plant.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $7.1M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Arkabutla Lake Hydroelectric ProjectTennessee Valley Authority (TVA)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP