Search plants, projects, owners, and states
5 MW Hydro planned in Panola, MS — Tennessee Valley Authority
5 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
34.1581, -89.9055
County
Panola, MS
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Enid Lake Hydroelectric Project is a 5 MW conventional hydroelectric power plant located in Panola County, Mississippi. It is owned and operated by Rye Development. The plant utilizes water (WAT) as its primary fuel source and consists of two generators.
The plant operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. It is ranked as the 4th largest hydroelectric plant in Mississippi out of 4 such plants, and nationally it is ranked 881 out of 1464 hydroelectric facilities.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
No generation data available for this plant.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $7.1M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Enid Lake Hydroelectric ProjectTennessee Valley Authority (TVA)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP