1 MW Solar operating in Douglas, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
45.8468, -95.1492
County
Douglas, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | REA Investments, LLC | REA Investments | — |
| Owner(s) | REA Investments, LLC | — | — |
| Status | Operating | operating | — |
The Novel Herickhoff Solar CSG is a 1 MW solar photovoltaic power plant located in Douglas County, Minnesota. The plant began operating in 2020 and is owned and operated by REA Investments, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, the Novel Herickhoff Solar CSG generated 1,422 MWh of electricity, achieving a capacity factor of 16.3%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the Novel Herickhoff Solar CSG ranks as the 286th largest power plant in Minnesota out of 540, and 6506th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
480.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
45 MWh
Latest Month
1.4K MWh
Annual Generation
16.3%
Capacity Factor
Data from 2021–2024
$28.3/MWh
Energy Value
$2.0/MWh
Capacity Value
Point of Interconnection
Nearest Substation
Douglas County Substation · 115 kV
Substation Distance
< 10 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Novel Herickhoff Solar CSG