3.5 MW Natural Gas operating in Putnam, OH — PJM Interconnection, LLC
3.5 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Steam Turbine
Technology
2017
Operating Since
Coordinates
41.1206, -83.9706
County
Putnam, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | POET Biorefining - Leipsic, LLC | — | — |
| Owner(s) | POET Biorefining - Leipsic, LLC | — | — |
| Status | Operating | — | — |
POET Biorefining - Leipsic, LLC is a 3.5 MW natural gas-fired power plant located in Putnam County, Ohio. The plant began operating in 2017 and is owned and operated by POET Biorefining - Leipsic, LLC. It consists of a single natural gas steam turbine generator. The plant is interconnected to the grid and operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region.
In its most recent year of operation, the plant generated 6,045 MWh of electricity, achieving a capacity factor of 19.7%. According to available data, the plant ranks 43rd out of 46 power plants in Ohio and 1664th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
582 MWh
Latest Month
6.0K MWh
Annual Generation
19.7%
Capacity Factor
CO₂ Intensity
700 lb/MWh
NOx
0.978 lb/MWh
SO₂
2017
$920/kW
Est. Construction Cost
Total estimated cost: $3.2M
Market Position
ISO/RTO Market
PJM
LMP Node
NLEIPSSW69 KV NLEIPSIC
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about POET Biorefining - Leipsic, LLCPJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
0.003 lb/MWh
CH₄
0.013 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
42.5%
Annual Net Gen
13 GWh
CO₂eq
700 lb/MWh
Subregion