Search plants, projects, owners, and states
1 MW Solar operating in Waseca, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
44.0068, -93.4942
County
Waseca, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Excelsior Energy Capital | Excelsior Energy Capital | — |
| Owner(s) | Excelsior Energy Capital | — | — |
| Status | Operating | operating | — |
Silver Lake Garden is a 1 MW solar photovoltaic power plant located in Waseca County, Minnesota. The plant, which began operating in 2021, is owned and operated by Excelsior Energy Capital. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's latest annual generation was 1,642 MWh, resulting in a capacity factor of 18.7%. Silver Lake Garden operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the plant ranks 503 out of 540 power plants in Minnesota, and 6785 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
41 MWh
Latest Month
1.6K MWh
Annual Generation
18.7%
Capacity Factor
Data from 2022–2024
$24.6/MWh
Energy Value
$2.7/MWh
Capacity Value
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Silver Lake GardenMidcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP