Search plants, projects, owners, and states
1.2 MW Natural Gas operating in Harris, TX — Electric Reliability Council of Texas, Inc.
1.2 MW
Nameplate Capacity
3
Generators
units
Natural Gas Internal Combustion Engine
Technology
2021
Operating Since
Coordinates
29.7763, -94.9745
County
Harris, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Walmart Stores Texas, LLC | — | — |
| Owner(s) | Walmart Stores Texas, LLC | — | — |
| Status | Operating | — | — |
Located in Harris County, Texas, WAL194 is a natural gas-fired power plant owned and operated by Walmart Stores Texas, LLC. The plant began operating in 2021 and has a total capacity of 1.2 MW, distributed across three natural gas internal combustion engine generators. WAL194 operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region.
In its most recent year of operation, WAL194 generated 209 MWh of electricity, achieving a capacity factor of 2.0%. The plant is a relatively small contributor to the Texas power grid, ranking 303rd out of 312 power plants in the state and 1895th out of 1963 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
15 MWh
Latest Month
209 MWh
Annual Generation
2.0%
Capacity Factor
CO₂ Intensity
1784 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
35 lb/MWh
SO₂
0.050 lb/MWh
CH₄
0.034 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
2.8%
Annual Net Gen
0 GWh
CO₂eq
1786 lb/MWh
Subregion
ERCOT All
2021
$920/kW
Est. Construction Cost
Total estimated cost: $1.1M
Point of Interconnection
Nearest Substation
Cedar Bayou Substation · 138 kV
Substation Distance
< 10 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about WAL194