2 MW Solar operating in Boone, KY — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
38.9064, -76.8667
County
Boone, KY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Kentucky Inc | Duke Energy Kentucky | — |
| Owner(s) | Duke Energy Kentucky Inc | Duke Energy | — |
| Status | Operating | operating | — |
The Aero Solar Facility is a 2 MW solar photovoltaic power plant located in Boone County, Kentucky. The plant began operating in 2023 and has a single generator. It is owned by Duke Energy and operated by Duke Energy Kentucky Inc. The facility's primary fuel source is solar energy.
In its most recent year of operation, the Aero Solar Facility generated 2,907 MWh of electricity, achieving a capacity factor of 16.5%. The plant uses a fixed tilt solar tracking system. The facility operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. Aero Solar Facility is ranked as the 29th largest solar plant in Kentucky out of 31, and nationally it is ranked 4627 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
100 MWh
Latest Month
2.9K MWh
Annual Generation
16.5%
Capacity Factor
Data from 2024
$32.1/MWh
Energy Value
$7.5/MWh
Capacity Value
Market Position
ISO/RTO Market
PJM
LMP Node
AERO1 138 KV LOAD4
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Aero Solar FacilityPJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility