Search plants, projects, owners, and states
7.2 MW Batteries (2 MW) + Solar Photovoltaic (5 MW) operating in Plymouth, MA — ISO New England Inc.
7.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
41.7916, -70.7247
County
Plymouth, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 77F2M WHAM8 Solar, LLC | 77F2M WHAM8 Solar | — |
| Owner(s) | 77F2M WHAM8 Solar, LLC | — | — |
| Status | Operating | operating | — |
Located in Plymouth County, Massachusetts, the 77 Farm to Market Rd Hybrid(CSG) is a hybrid power plant combining solar photovoltaic generation with battery energy storage. The plant, owned and operated by 77F2M WHAM8 Solar, LLC, began operating in 2021. It has a total capacity of 7.2 MW across two generators, utilizing both solar and battery technologies. The battery energy storage system (BESS) has a capacity of 4.8 MWh and a duration of 2.18 hours, employing lithium-ion battery chemistry (LIB). The solar array uses a fixed tilt tracking system.
The plant's primary fuel is electricity (MWH), reflecting its hybrid nature. In its latest year of operation, the plant generated 9,351 MWh, achieving a capacity factor of 14.8%. The 77 Farm to Market Rd Hybrid(CSG) operates within the ISO New England Inc. balancing authority and the NPCC NERC region. It is ranked as the 46th largest plant out of 126 in Massachusetts, and 912th out of 1205 nationally. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
22.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
409 MWh
Latest Month
9.4K MWh
Annual Generation
14.8%
Capacity Factor
Data from 2021–2024
$31.9/MWh
Energy Value
$4.1/MWh
Capacity Value
Point of Interconnection
Nearest Substation
Wareham Substation · 115 kV
Substation Distance
2.683 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WAREHAM 23
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.