Search plants, projects, owners, and states
5 MW BESS operating in Pender, NC — Duke Energy Progress East
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
34.4753, -77.8299
County
Pender, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina El Member Corp | — | — |
| Owner(s) | North Carolina El Member Corp | — | — |
| Status | Operating | — | — |
Rocky Point BESS is a 5 MW battery energy storage system located in Pender County, North Carolina. The plant began operating in 2024 and is owned and operated by North Carolina Electric Membership Corporation. The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 5 MWh, providing a duration of 1 hour at full power. The plant's primary fuel is listed as "MWH," indicating that it draws power from the grid to charge its batteries.
The Rocky Point BESS operates within the Duke Energy Progress East balancing authority and the SERC NERC region. It is ranked as the 13th largest of 36 battery storage facilities in North Carolina and 959th largest of 1205 such facilities nationally. The plant consists of a single generator utilizing battery technology.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
−15 MWh
Net Charging
-218 MWh
Annual Net Energy
-0.5%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $6.8M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Rocky Point BESSDuke Energy Progress East (CPLE)
Grid Voltage
24.94 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility