1.2 MW Natural Gas operating in Harris, TX — Electric Reliability Council of Texas, Inc.
1.2 MW
Nameplate Capacity
3
Generators
units
Natural Gas Internal Combustion Engine
Technology
2018
Operating Since
Coordinates
29.7862, -95.5394
County
Harris, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Texas Microgrid, LLC | — | — |
| Owner(s) | Texas Microgrid, LLC | — | — |
| Status | Operating | — | — |
HEB00109 is a natural gas-fired power plant located in Harris County, Texas. The plant is owned and operated by Texas Microgrid, LLC. It commenced operations in 2018 and has a total capacity of 1.2 MW, distributed across three natural gas-fueled internal combustion engine generators. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority area.
In its most recent year of operation, HEB00109 generated 303 MWh of electricity, resulting in a capacity factor of 2.9%. The plant's relatively small size results in a ranking of 228 out of 312 power plants in Texas, and 1850 out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
22 MWh
Latest Month
303 MWh
Annual Generation
2.9%
Capacity Factor
CO₂ Intensity
1705 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
34 lb/MWh
SO₂
2018
$837/kW
Est. Construction Cost
Total estimated cost: $1.0M
Point of Interconnection
Nearest Substation
Sauer Substation · 138 kV
Substation Distance
< 10 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about HEB00109Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0.047 lb/MWh
CH₄
0.032 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
3.3%
Annual Net Gen
0 GWh
CO₂eq
1706 lb/MWh
Subregion
ERCOT All