62.4 MW Batteries (13 MW) + Solar Photovoltaic (50 MW) operating in Ross, OH — PJM Interconnection, LLC
62.4 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Coordinates
39.4147, -82.9629
County
Ross, OH
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Salt City Solar LLC | ENGIE SA | — |
| Owner(s) | Salt City Solar LLC | ENGIE | — |
| Status | Operating | operating | — |
The Salt City Solar Project - Hybrid is a 62.4 MW hybrid power plant located in Ross County, Ohio. The facility began operating in 2023 and is owned by ENGIE, a French multinational utility, and operated by Salt City Solar LLC. The plant utilizes both solar photovoltaic technology and battery storage. It consists of two generators and employs single-axis solar tracking.
The plant's primary fuel source is listed as MWH, reflecting its reliance on solar energy. In its latest year of operation, the Salt City Solar Project generated 103,713 MWh of electricity, achieving a capacity factor of 18.9%. The facility operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. According to available data, the Salt City Solar Project ranks 5th out of 10 solar plants in Ohio and 575th out of 1205 nationally. Financial data is available for the plant from sources such as lbnl_solar.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.5K MWh
Latest Month
103.7K MWh
Annual Generation
18.9%
Capacity Factor
Data from 2023–2024
$33.2/MWh
Energy Value
$3.3/MWh
Capacity Value
Market Position
ISO/RTO Market
PJM
LMP Node
DELANO 34.5 KV SALTCTSP
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Salt City Solar Project - Hybrid