22.9 MW Solar operating in Suffolk, NY — New York Independent System Operator
22.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
40.9111, -72.7520
County
Suffolk, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | LI Solar Generation, LLC | LI Solar Generation | — |
| Owner(s) | National Grid, NextEra Energy Resources Breckinridge | NextEra Energy | — |
| Status | Operating | operating | — |
Calverton Solar Energy Center is a 22.9 MW solar photovoltaic power plant located in Suffolk County, New York. The plant began operating in 2022 and has one generator. It is owned by NextEra Energy and operated by LI Solar Generation, LLC. The facility utilizes a fixed-tilt solar tracking system. Calverton Solar is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked 30th out of 695 power plants in New York state, and 1334th nationally out of 7108 plants.
In its most recent year of operation, Calverton Solar Energy Center generated 43,727 MWh of electricity, resulting in a capacity factor of 21.7%. The plant has a reported power purchase agreement (PPA) price of $122.5 per MWh, according to data from LBNL Solar and FERC EQR filings.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.3K MWh
Latest Month
43.7K MWh
Annual Generation
21.7%
Capacity Factor
LI Solar Generation, LLC · Data from 2022–2025
$156.8/MWh
PPA Price
Point of Interconnection
Nearest Substation
CALVERTON___SOLAR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone K
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-14