Search plants, projects, owners, and states
300 MW BESS planned in Los Angeles, CA — California Independent System Operator
300 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
34.2912, -118.7518
County
Los Angeles, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hecate Grid Humidor Storage 1 LLC | — | — |
| Owner(s) | Hecate Grid Humidor Storage 1 LLC | — | — |
| Status | Planned | — | — |
Humidor Storage I is a 300 MW battery energy storage system located in Los Angeles County, California. The plant is owned and operated by Hecate Grid Humidor Storage 1 LLC. The primary fuel source is electricity (MWH), which is used to charge the batteries. The facility consists of a single generator utilizing battery storage technology.
Humidor Storage I operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 35th largest power plant in California out of 112, and nationally it is ranked 149th out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $408.3M
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match
Last updated 2026-03-26
View all 10 articlesNo ask pi reports yet for this entity.
ask pi about Humidor Storage ICalifornia Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP