3.3 MW Solar operating in Aroostook, ME — ISO New England Inc.
3.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
46.6433, -67.9087
County
Aroostook, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Easton CSG 1 LLC | Easton CSG 1 | — |
| Owner(s) | Easton CSG 1 LLC | — | — |
| Status | Operating | operating | — |
Easton CSG 1 LLC is a 3.3 MW solar photovoltaic power plant located in Aroostook County, Maine. The plant, owned and operated by Easton CSG 1 LLC, commenced operations in 2024. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the grid and operates within the ISO New England Inc. balancing authority, which falls under the North American Electric Reliability Corporation (NERC) Northeast Power Coordinating Council (NPCC) region.
In its most recent year of operation, Easton CSG 1 LLC generated 5,237 MWh of electricity, achieving a capacity factor of 18.1%. The facility has one generator. In terms of size, the plant ranks 111th out of 153 power plants in the state of Maine, and 3722nd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
144 MWh
Latest Month
5.2K MWh
Annual Generation
18.1%
Capacity Factor
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $8.5M
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
ISO New England Inc. (ISNE)
Grid Voltage
480.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP