Search plants, projects, owners, and states
1 MW Solar operating in Sibley, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
44.5424, -94.2227
County
Sibley, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Titlow Garden LLC | Titlow Garden | — |
| Owner(s) | Titlow Garden LLC | — | — |
| Status | Operating | operating | — |
Titlow Garden LLC CSG is a 1 MW solar photovoltaic power plant located in Sibley County, Minnesota. The plant began operating in 2023 and is owned and operated by Titlow Garden LLC. It utilizes single-axis tracking technology to maximize solar energy capture.
The plant's latest annual generation was 1,880 MWh, resulting in a capacity factor of 21.4%. Titlow Garden LLC CSG is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid, and falls under the control of the same balancing authority. According to available data, the plant ranks 449th in size among Minnesota power plants and 6892nd nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
45 MWh
Latest Month
1.9K MWh
Annual Generation
21.4%
Capacity Factor
Data from 2024
$27.3/MWh
Energy Value
$2.3/MWh
Capacity Value
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Titlow Garden LLC CSGMidcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
480.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP