150 MW BESS operating in Crane, TX — Electric Reliability Council of Texas, Inc.
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
31.1910, -102.3185
County
Crane, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Crane 2 BESS, LLC | — | — |
| Owner(s) | Crane 2 BESS, LLC | — | — |
| Status | Operating | — | — |
Revolution is a 150 MW battery energy storage system (BESS) located in Crane County, Texas. The plant, which began operating in 2023, has one generator utilizing battery technology with lithium-ion (LIB) chemistry. It is owned and operated by Crane 2 BESS, LLC. The plant's total storage capacity is 368.8 MWh, providing a duration of approximately 2.46 hours at full output.
Revolution operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region of TRE. It ranks as the 158th largest power plant in Texas out of 224, and 389th nationally out of 514. The plant's primary fuel is electricity (MWH), indicating it charges from the grid.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
−300 MWh
Net Charging
-13.9K MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $204.2M
Market Position
ISO/RTO Market
ERCOT
LMP Node
TBWF_ES_BES1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all 10 articlesNo ask pi reports yet for this entity.
ask pi about RevolutionElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP