300 MW Batteries (100 MW) + Solar Photovoltaic (200 MW) planned in Milam, TX — Electric Reliability Council of Texas, Inc.
300 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
32.7776, -101.6294
County
Milam, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Yaupon Solar, LLC | — | — |
| Owner(s) | Yaupon Solar, LLC | — | — |
| Status | Planned | announced | — |
The Yaupon Solar Project (Hybrid) is a 300 MW hybrid power plant located in Milam County, Texas. The facility is owned and operated by Yaupon Solar, LLC. The plant utilizes both solar photovoltaic technology and battery storage. It consists of two generators and employs a fixed tilt solar tracking system.
Yaupon Solar operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is within the TRE NERC region. The plant's primary fuel source is listed as "MWH". Yaupon Solar ranks as the 51st largest power plant in Texas out of 224, and nationally it ranks 161st out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $462.9M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.