Search plants, projects, owners, and states
3 MW Solar operating in Polk, OR — Portland General Electric Company
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
45.0282, -123.0969
County
Polk, OR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SolRiver Capital LLC | SolRiver Capital | — |
| Owner(s) | SolRiver Capital LLC | — | — |
| Status | Operating | operating | — |
Wallace Solar LLC (CSG) is a 3 MW solar photovoltaic power plant located in Polk County, Oregon. The plant began operating in 2024 and has a single generator. It is owned and operated by SolRiver Capital LLC. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's output is delivered to the grid within the Portland General Electric Company balancing authority, which is part of the Western Electricity Coordinating Council (WECC) NERC region. Wallace Solar ranks as the 68th largest solar plant in Oregon out of 147, and 3874th nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Wallace Solar LLC (CSG)Portland General Electric Company (PGE)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP