Search plants, projects, owners, and states
10 MW Batteries (5 MW) + Solar Photovoltaic (5 MW) operating in Onondaga, NY — New York Independent System Operator
10 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
43.1503, -76.0882
County
Onondaga, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Convergent Energy and Power LP | Convergent Energy and Power | — |
| Owner(s) | Convergent Energy and Power LP | — | — |
| Status | Operating | operating | — |
Cicero Energy Storage 1 LLC is a 10 MW hybrid power plant located in Onondaga County, New York. The facility, which began operating in 2022, is owned and operated by Convergent Energy and Power LP. The plant utilizes both solar photovoltaic and battery storage technologies, with MWH listed as the primary fuel. It consists of two generators and features a battery energy storage system (BESS) with a storage capacity of 20 MWh and a duration of 4 hours, utilizing lithium-ion battery chemistry (LIB). The solar array employs a fixed-tilt tracking system.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, Cicero Energy Storage 1 LLC generated 6,957 MWh, resulting in a capacity factor of 7.9%. The plant is ranked 25th out of 65 power plants in New York and 745th out of 1205 nationally. Financial data is available for the plant from sources such as Lawrence Berkeley National Laboratory (LBNL) solar data.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
122 MWh
Net Discharge
7.0K MWh
Annual Net Energy
7.9%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Data from 2022–2024
$30.5/MWh
Energy Value
$10.9/MWh
Capacity Value
Point of Interconnection
Nearest Substation
NM_CENTRAL___DRP
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone C
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No ask pi reports yet for this entity.
ask pi about Cicero Energy Storage 1 LLCNew York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP